Upgrade of the Trigger Synchronisation and Distribution System of the Beam Dumping System of the Large Hadron Collider

Various upgrades were performed on the Large Hadron Collider (LHC) Beam Dumping System (LBDS) during Long Shutdown 1 (LS1) at CERN, in particular to the Trigger Synchronisation and Distribution System (TSDS): A redundant direct connection from the LHC Beam Interlock System to the re-trigger lines of...

Descripción completa

Detalles Bibliográficos
Autores principales: Magnin, Nicolas, Antoine, Alain, Carlier, Etienne, Chareyre, Vincent, Gabourin, Stéphane, Patsouli, Anastasia, Voumard, Nicolas
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-ICALEPCS2015-MOPGF135