Cargando…

Upgrade of the Trigger Synchronisation and Distribution System of the Beam Dumping System of the Large Hadron Collider

Various upgrades were performed on the Large Hadron Collider (LHC) Beam Dumping System (LBDS) during Long Shutdown 1 (LS1) at CERN, in particular to the Trigger Synchronisation and Distribution System (TSDS): A redundant direct connection from the LHC Beam Interlock System to the re-trigger lines of...

Descripción completa

Detalles Bibliográficos
Autores principales: Magnin, Nicolas, Antoine, Alain, Carlier, Etienne, Chareyre, Vincent, Gabourin, Stéphane, Patsouli, Anastasia, Voumard, Nicolas
Lenguaje:eng
Publicado: 2015
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-ICALEPCS2015-MOPGF135
http://cds.cern.ch/record/2213481
_version_ 1780951994801848320
author Magnin, Nicolas
Antoine, Alain
Carlier, Etienne
Chareyre, Vincent
Gabourin, Stéphane
Patsouli, Anastasia
Voumard, Nicolas
author_facet Magnin, Nicolas
Antoine, Alain
Carlier, Etienne
Chareyre, Vincent
Gabourin, Stéphane
Patsouli, Anastasia
Voumard, Nicolas
author_sort Magnin, Nicolas
collection CERN
description Various upgrades were performed on the Large Hadron Collider (LHC) Beam Dumping System (LBDS) during Long Shutdown 1 (LS1) at CERN, in particular to the Trigger Synchronisation and Distribution System (TSDS): A redundant direct connection from the LHC Beam Interlock System to the re-trigger lines of the LBDS was implemented, a fully redundant powering architecture was set up, and new Trigger Synchronisation Unit cards were deployed over two separate crates instead of one. These hardware changes implied the adaptation of the State Control and Surveillance System and an improvement of the monitoring and diagnosis systems, like the various Internal Post Operation Check (IPOC) systems that ensure that, after every beam dump event, the LBDS worked as expected and is 'as good as new' for the next LHC beam. This paper summarises the changes performed on the TSDS during LS1, highlights the upgrade of the IPOC systems and presents the problems encountered during the commissioning of TSDS before the LHC Run II.
id oai-inspirehep.net-1481565
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2015
record_format invenio
spelling oai-inspirehep.net-14815652019-09-30T06:29:59Zdoi:10.18429/JACoW-ICALEPCS2015-MOPGF135http://cds.cern.ch/record/2213481engMagnin, NicolasAntoine, AlainCarlier, EtienneChareyre, VincentGabourin, StéphanePatsouli, AnastasiaVoumard, NicolasUpgrade of the Trigger Synchronisation and Distribution System of the Beam Dumping System of the Large Hadron ColliderAccelerators and Storage RingsVarious upgrades were performed on the Large Hadron Collider (LHC) Beam Dumping System (LBDS) during Long Shutdown 1 (LS1) at CERN, in particular to the Trigger Synchronisation and Distribution System (TSDS): A redundant direct connection from the LHC Beam Interlock System to the re-trigger lines of the LBDS was implemented, a fully redundant powering architecture was set up, and new Trigger Synchronisation Unit cards were deployed over two separate crates instead of one. These hardware changes implied the adaptation of the State Control and Surveillance System and an improvement of the monitoring and diagnosis systems, like the various Internal Post Operation Check (IPOC) systems that ensure that, after every beam dump event, the LBDS worked as expected and is 'as good as new' for the next LHC beam. This paper summarises the changes performed on the TSDS during LS1, highlights the upgrade of the IPOC systems and presents the problems encountered during the commissioning of TSDS before the LHC Run II.oai:inspirehep.net:14815652015
spellingShingle Accelerators and Storage Rings
Magnin, Nicolas
Antoine, Alain
Carlier, Etienne
Chareyre, Vincent
Gabourin, Stéphane
Patsouli, Anastasia
Voumard, Nicolas
Upgrade of the Trigger Synchronisation and Distribution System of the Beam Dumping System of the Large Hadron Collider
title Upgrade of the Trigger Synchronisation and Distribution System of the Beam Dumping System of the Large Hadron Collider
title_full Upgrade of the Trigger Synchronisation and Distribution System of the Beam Dumping System of the Large Hadron Collider
title_fullStr Upgrade of the Trigger Synchronisation and Distribution System of the Beam Dumping System of the Large Hadron Collider
title_full_unstemmed Upgrade of the Trigger Synchronisation and Distribution System of the Beam Dumping System of the Large Hadron Collider
title_short Upgrade of the Trigger Synchronisation and Distribution System of the Beam Dumping System of the Large Hadron Collider
title_sort upgrade of the trigger synchronisation and distribution system of the beam dumping system of the large hadron collider
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-ICALEPCS2015-MOPGF135
http://cds.cern.ch/record/2213481
work_keys_str_mv AT magninnicolas upgradeofthetriggersynchronisationanddistributionsystemofthebeamdumpingsystemofthelargehadroncollider
AT antoinealain upgradeofthetriggersynchronisationanddistributionsystemofthebeamdumpingsystemofthelargehadroncollider
AT carlieretienne upgradeofthetriggersynchronisationanddistributionsystemofthebeamdumpingsystemofthelargehadroncollider
AT chareyrevincent upgradeofthetriggersynchronisationanddistributionsystemofthebeamdumpingsystemofthelargehadroncollider
AT gabourinstephane upgradeofthetriggersynchronisationanddistributionsystemofthebeamdumpingsystemofthelargehadroncollider
AT patsoulianastasia upgradeofthetriggersynchronisationanddistributionsystemofthebeamdumpingsystemofthelargehadroncollider
AT voumardnicolas upgradeofthetriggersynchronisationanddistributionsystemofthebeamdumpingsystemofthelargehadroncollider