Upgrade of the Trigger Synchronisation and Distribution System of the Beam Dumping System of the Large Hadron Collider
Various upgrades were performed on the Large Hadron Collider (LHC) Beam Dumping System (LBDS) during Long Shutdown 1 (LS1) at CERN, in particular to the Trigger Synchronisation and Distribution System (TSDS): A redundant direct connection from the LHC Beam Interlock System to the re-trigger lines of...
Autores principales: | Magnin, Nicolas, Antoine, Alain, Carlier, Etienne, Chareyre, Vincent, Gabourin, Stéphane, Patsouli, Anastasia, Voumard, Nicolas |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-ICALEPCS2015-MOPGF135 http://cds.cern.ch/record/2213481 |
Ejemplares similares
-
The LHC Beam Dumping System Trigger Synchronisation and Distribution System
por: Antoine, A, et al.
Publicado: (2005) -
Changes to the LHC Beam Dumping System for LHC Run 2
por: Uythoven, Jan, et al.
Publicado: (2015) -
First Operational Experience with the LHC Beam Dump Trigger Synchronisation Unit
por: Antoine, A, et al.
Publicado: (2011) -
SPS Beam Dump System (SBDS) Commissioning After Relocation and Upgrade
por: Van Trappen, Pieter, et al.
Publicado: (2022) -
LHC beam dumping system: status and readiness for LHC Run 2
por: Magnin, N, et al.