Cargando…
Development of a test bench to prepare the assembly of the IFMIF LIPAC cavity string
The IFMIF LIPAc cryomodule houses eight half-wave resonators and eight solenoids which will be assembled on a support frame in clean room. Due to the short lattice defined by beam dynamics constraints, there is not much room between two elements for the operators’ hands to connect them. In order to...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-SRF2015-TUPB107 http://cds.cern.ch/record/2288273 |