Cargando…
Development of a test bench to prepare the assembly of the IFMIF LIPAC cavity string
The IFMIF LIPAc cryomodule houses eight half-wave resonators and eight solenoids which will be assembled on a support frame in clean room. Due to the short lattice defined by beam dynamics constraints, there is not much room between two elements for the operators’ hands to connect them. In order to...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2015
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-SRF2015-TUPB107 http://cds.cern.ch/record/2288273 |
_version_ | 1780956153869500416 |
---|---|
author | Bazin, Nicolas Chambrillon, Janic Kevin Devanz, Guillaume Dzitko, Hervé Hardy, Philippe Neyret, Jerome Servouin, Christophe Toral, Fernando |
author_facet | Bazin, Nicolas Chambrillon, Janic Kevin Devanz, Guillaume Dzitko, Hervé Hardy, Philippe Neyret, Jerome Servouin, Christophe Toral, Fernando |
author_sort | Bazin, Nicolas |
collection | CERN |
description | The IFMIF LIPAc cryomodule houses eight half-wave resonators and eight solenoids which will be assembled on a support frame in clean room. Due to the short lattice defined by beam dynamics constraints, there is not much room between two elements for the operators’ hands to connect them. In order to test, optimize and validate the clean room assembly procedures and the associated tools, a test bench, consisting of a frame, a little bigger than one eight of the final support has been manufactured. In order to start the tests before the delivery of the actual key components of the cryomodule, a dummy cavity, solenoid and coupler were manufactured and will be used to perform tests outside and inside the clean room to validate the assembly procedure and the tools. The mock-up will then be used to train the operators for the assembly of the whole string. |
id | oai-inspirehep.net-1482137 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2015 |
record_format | invenio |
spelling | oai-inspirehep.net-14821372019-09-30T06:29:59Zdoi:10.18429/JACoW-SRF2015-TUPB107http://cds.cern.ch/record/2288273engBazin, NicolasChambrillon, Janic KevinDevanz, GuillaumeDzitko, HervéHardy, PhilippeNeyret, JeromeServouin, ChristopheToral, FernandoDevelopment of a test bench to prepare the assembly of the IFMIF LIPAC cavity stringAccelerators and Storage RingsThe IFMIF LIPAc cryomodule houses eight half-wave resonators and eight solenoids which will be assembled on a support frame in clean room. Due to the short lattice defined by beam dynamics constraints, there is not much room between two elements for the operators’ hands to connect them. In order to test, optimize and validate the clean room assembly procedures and the associated tools, a test bench, consisting of a frame, a little bigger than one eight of the final support has been manufactured. In order to start the tests before the delivery of the actual key components of the cryomodule, a dummy cavity, solenoid and coupler were manufactured and will be used to perform tests outside and inside the clean room to validate the assembly procedure and the tools. The mock-up will then be used to train the operators for the assembly of the whole string.oai:inspirehep.net:14821372015 |
spellingShingle | Accelerators and Storage Rings Bazin, Nicolas Chambrillon, Janic Kevin Devanz, Guillaume Dzitko, Hervé Hardy, Philippe Neyret, Jerome Servouin, Christophe Toral, Fernando Development of a test bench to prepare the assembly of the IFMIF LIPAC cavity string |
title | Development of a test bench to prepare the assembly of the IFMIF LIPAC cavity string |
title_full | Development of a test bench to prepare the assembly of the IFMIF LIPAC cavity string |
title_fullStr | Development of a test bench to prepare the assembly of the IFMIF LIPAC cavity string |
title_full_unstemmed | Development of a test bench to prepare the assembly of the IFMIF LIPAC cavity string |
title_short | Development of a test bench to prepare the assembly of the IFMIF LIPAC cavity string |
title_sort | development of a test bench to prepare the assembly of the ifmif lipac cavity string |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-SRF2015-TUPB107 http://cds.cern.ch/record/2288273 |
work_keys_str_mv | AT bazinnicolas developmentofatestbenchtopreparetheassemblyoftheifmiflipaccavitystring AT chambrillonjanickevin developmentofatestbenchtopreparetheassemblyoftheifmiflipaccavitystring AT devanzguillaume developmentofatestbenchtopreparetheassemblyoftheifmiflipaccavitystring AT dzitkoherve developmentofatestbenchtopreparetheassemblyoftheifmiflipaccavitystring AT hardyphilippe developmentofatestbenchtopreparetheassemblyoftheifmiflipaccavitystring AT neyretjerome developmentofatestbenchtopreparetheassemblyoftheifmiflipaccavitystring AT servouinchristophe developmentofatestbenchtopreparetheassemblyoftheifmiflipaccavitystring AT toralfernando developmentofatestbenchtopreparetheassemblyoftheifmiflipaccavitystring |