Cargando…

Cold Powering Performance of the First 2 m $Nb_3Sn$ DS11T Twin-Aperture Model Magnet at CERN

Abstract: For the upgrade of the LHC during the long shutdown 2 and for the HL-LHC upgrade during the long shutdown 3, a few 15 m 8.3 T Nb-Ti main dipole magnets are foreseen to be replaced by two 11 T $Nb_3Sn$ dipoles, 5.5 m long each. After the production and test of three single aperture models a...

Descripción completa

Detalles Bibliográficos
Autores principales: Willering, G P, Bajko, M, Bajas, H, Bordini, B, Bottura, L, Feuvrier, J, Fiscarelli, L, Guinchard, M, Izquierdo Bermudez, S, Karppinen, M, Loffler, C, Perez, J -C, de Rijk, G, Savary, F, Smekens, D
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:https://dx.doi.org/10.1109/TASC.2016.2633421
http://cds.cern.ch/record/2275938