Cargando…
Cold Powering Performance of the First 2 m $Nb_3Sn$ DS11T Twin-Aperture Model Magnet at CERN
Abstract: For the upgrade of the LHC during the long shutdown 2 and for the HL-LHC upgrade during the long shutdown 3, a few 15 m 8.3 T Nb-Ti main dipole magnets are foreseen to be replaced by two 11 T $Nb_3Sn$ dipoles, 5.5 m long each. After the production and test of three single aperture models a...
Autores principales: | , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2016.2633421 http://cds.cern.ch/record/2275938 |