Cargando…
Cold Powering Performance of the First 2 m $Nb_3Sn$ DS11T Twin-Aperture Model Magnet at CERN
Abstract: For the upgrade of the LHC during the long shutdown 2 and for the HL-LHC upgrade during the long shutdown 3, a few 15 m 8.3 T Nb-Ti main dipole magnets are foreseen to be replaced by two 11 T $Nb_3Sn$ dipoles, 5.5 m long each. After the production and test of three single aperture models a...
Autores principales: | Willering, G P, Bajko, M, Bajas, H, Bordini, B, Bottura, L, Feuvrier, J, Fiscarelli, L, Guinchard, M, Izquierdo Bermudez, S, Karppinen, M, Loffler, C, Perez, J -C, de Rijk, G, Savary, F, Smekens, D |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/TASC.2016.2633421 http://cds.cern.ch/record/2275938 |
Ejemplares similares
-
Cold Powering Tests of 11-T Nb$_{3}$Sn Dipole Models for LHC Upgrades at CERN
por: Willering, G, et al.
Publicado: (2016) -
Comparison of Cold Powering Performance of 2-m-Long Nb$_{3}$Sn 11 T Model Magnets
por: Willering, Gerard, et al.
Publicado: (2018) -
Quench protection of the 11 T Nb$_{3}$Sn dipole for the High Luminosity LHC
por: Izquierdo Bermudez, S, et al.
Publicado: (2018) -
Magnetic Measurements and Analysis of the First 11-T Nb$_{3}$Sn Dipole Models Developed at CERN for HL-LHC
por: Fiscarelli, L, et al.
Publicado: (2016) -
Quench Analysis of High Current Density Nb$_{3}$Sn Conductors in Racetrack Coil Configuration
por: Bajas, H, et al.
Publicado: (2015)