Cargando…
Operational experience of the upgraded LHC injection kicker magnets during Run 2 and future plans
During Run 1 of the LHC, one of the injection kicker magnets caused occasional operational delays due to beam induced heating with high bunch intensity and short bunch lengths. In addition, there were also sporadic issues with vacuum activity and electrical flashover of the injection kickers. An ext...
Autores principales: | , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1742-6596/874/1/012101 https://dx.doi.org/10.18429/JACoW-IPAC2017-WEPVA100 http://cds.cern.ch/record/2276060 |