Operational experience of the upgraded LHC injection kicker magnets during Run 2 and future plans
During Run 1 of the LHC, one of the injection kicker magnets caused occasional operational delays due to beam induced heating with high bunch intensity and short bunch lengths. In addition, there were also sporadic issues with vacuum activity and electrical flashover of the injection kickers. An ext...
Autores principales: | , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1742-6596/874/1/012101 https://dx.doi.org/10.18429/JACoW-IPAC2017-WEPVA100 http://cds.cern.ch/record/2276060 |
_version_ | 1780955269596971008 |
---|---|
author | Barnes, M J Adraktas, A Bregliozzi, G Goddard, B Ducimetière, L Salvant, B Sestak, J Vega Cid, L Weterings, W Yin Vallgren, C |
author_facet | Barnes, M J Adraktas, A Bregliozzi, G Goddard, B Ducimetière, L Salvant, B Sestak, J Vega Cid, L Weterings, W Yin Vallgren, C |
author_sort | Barnes, M J |
collection | CERN |
description | During Run 1 of the LHC, one of the injection kicker magnets caused occasional operational delays due to beam induced heating with high bunch intensity and short bunch lengths. In addition, there were also sporadic issues with vacuum activity and electrical flashover of the injection kickers. An extensive program of studies was launched and significant upgrades were carried out during Long Shutdown 1 (LS 1). These upgrades included a new design of beam screen to reduce both beam coupling impedance of the kicker magnet and the electric field associated with the screen conductors, hence decreasing the probability of electrical breakdown in this region. This paper presents operational experience of the injection kicker magnets during the first years of Run 2 of the LHC, including a discussion of faults and kicker magnet issues that limited LHC operation. In addition, in light of these issues, plans for further upgrades are briefly discussed. |
id | oai-inspirehep.net-1611212 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2017 |
record_format | invenio |
spelling | oai-inspirehep.net-16112122021-02-09T10:05:53Zdoi:10.1088/1742-6596/874/1/012101doi:10.18429/JACoW-IPAC2017-WEPVA100http://cds.cern.ch/record/2276060engBarnes, M JAdraktas, ABregliozzi, GGoddard, BDucimetière, LSalvant, BSestak, JVega Cid, LWeterings, WYin Vallgren, COperational experience of the upgraded LHC injection kicker magnets during Run 2 and future plansAccelerators and Storage RingsDuring Run 1 of the LHC, one of the injection kicker magnets caused occasional operational delays due to beam induced heating with high bunch intensity and short bunch lengths. In addition, there were also sporadic issues with vacuum activity and electrical flashover of the injection kickers. An extensive program of studies was launched and significant upgrades were carried out during Long Shutdown 1 (LS 1). These upgrades included a new design of beam screen to reduce both beam coupling impedance of the kicker magnet and the electric field associated with the screen conductors, hence decreasing the probability of electrical breakdown in this region. This paper presents operational experience of the injection kicker magnets during the first years of Run 2 of the LHC, including a discussion of faults and kicker magnet issues that limited LHC operation. In addition, in light of these issues, plans for further upgrades are briefly discussed.CERN-ACC-2017-310oai:inspirehep.net:16112122017 |
spellingShingle | Accelerators and Storage Rings Barnes, M J Adraktas, A Bregliozzi, G Goddard, B Ducimetière, L Salvant, B Sestak, J Vega Cid, L Weterings, W Yin Vallgren, C Operational experience of the upgraded LHC injection kicker magnets during Run 2 and future plans |
title | Operational experience of the upgraded LHC injection kicker magnets during Run 2 and future plans |
title_full | Operational experience of the upgraded LHC injection kicker magnets during Run 2 and future plans |
title_fullStr | Operational experience of the upgraded LHC injection kicker magnets during Run 2 and future plans |
title_full_unstemmed | Operational experience of the upgraded LHC injection kicker magnets during Run 2 and future plans |
title_short | Operational experience of the upgraded LHC injection kicker magnets during Run 2 and future plans |
title_sort | operational experience of the upgraded lhc injection kicker magnets during run 2 and future plans |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.1088/1742-6596/874/1/012101 https://dx.doi.org/10.18429/JACoW-IPAC2017-WEPVA100 http://cds.cern.ch/record/2276060 |
work_keys_str_mv | AT barnesmj operationalexperienceoftheupgradedlhcinjectionkickermagnetsduringrun2andfutureplans AT adraktasa operationalexperienceoftheupgradedlhcinjectionkickermagnetsduringrun2andfutureplans AT bregliozzig operationalexperienceoftheupgradedlhcinjectionkickermagnetsduringrun2andfutureplans AT goddardb operationalexperienceoftheupgradedlhcinjectionkickermagnetsduringrun2andfutureplans AT ducimetierel operationalexperienceoftheupgradedlhcinjectionkickermagnetsduringrun2andfutureplans AT salvantb operationalexperienceoftheupgradedlhcinjectionkickermagnetsduringrun2andfutureplans AT sestakj operationalexperienceoftheupgradedlhcinjectionkickermagnetsduringrun2andfutureplans AT vegacidl operationalexperienceoftheupgradedlhcinjectionkickermagnetsduringrun2andfutureplans AT weteringsw operationalexperienceoftheupgradedlhcinjectionkickermagnetsduringrun2andfutureplans AT yinvallgrenc operationalexperienceoftheupgradedlhcinjectionkickermagnetsduringrun2andfutureplans |