Cargando…
Beam Delivery System Optimization for CLIC 380 GeV
In the framework of the CLIC rebaselining, the Beam Delivery System (BDS) have been re-optimized for its initial stage at 380 GeV. Two BDS designs with L*=4.3 meters and L*=6 meters have been investigated. The optimization of the lattices and the beam parameters at the interaction point (IP) have be...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2017-MOPIK100 http://cds.cern.ch/record/2289697 |