Beam Delivery System Optimization for CLIC 380 GeV

In the framework of the CLIC rebaselining, the Beam Delivery System (BDS) have been re-optimized for its initial stage at 380 GeV. Two BDS designs with L*=4.3 meters and L*=6 meters have been investigated. The optimization of the lattices and the beam parameters at the interaction point (IP) have be...