Cargando…

Commissioning of the Stripping Foil Units for the Upgrade of the PSB H⁻ Injection System

The PSB will be extensively upgraded during the next long shutdown of the CERN accelerator complex, to double the brightness of the stored beams. The existing multi-turn injection will be replaced by a charge exchange system designed for the 160 MeV hydrogen ions provided by Linac4. Part of the inje...

Descripción completa

Detalles Bibliográficos
Autores principales: Bracco, Chiara, Burger, Stephane, Forte, Vincenzo, Goddard, Brennan, Guidoboni, Greta, Jorat, Louise Olivia, Mikulec, Bettina, Navarro Fernandez, Araceli, Noulibos, Remy, Roncarolo, Federico, Van Trappen, Pieter, Weterings, Wim
Lenguaje:eng
Publicado: 2017
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2017-MOPIK041
http://cds.cern.ch/record/2289151