Cargando…

Operational limits from intercepting devices

LHC operation in 2016 was limited by the constraints on the maximum allowed intensity in the SPS due to the vacuum leak at the internal dump. The present baseline foresees the replacement of the T1DVG with a new upgraded hardware during the upcoming EYETS. This would allow providing nominal 25 ns to...

Descripción completa

Detalles Bibliográficos
Autores principales: Bracco, C, Bartmann, W, Calviani, M, Frankl, M I, Fraser, M A, Gilardoni, S, Goddard, B, Kain, V, Lechner, A, Marcone, A Perillo, Meddahi, M, Nuiry, F X, Velotti, F M
Lenguaje:eng
Publicado: CERN 2017
Materias:
Acceso en línea:http://cds.cern.ch/record/2293528