Cargando…
LHC Operation at 6.5 TeV: Status and Beam Physics Issues
LHC operation restarted in 2015 after the first Long Shutdown, planning for a 4-year long run until the end of 2018 (called Run 2). The beam energy was fixed at 6.5 TeV. The year 2015 was dedicated to establishing operation at the high energy and with 25 ns beams, in order to prepare production for...
Autores principales: | , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-NAPAC2016-MOB3IO02 http://cds.cern.ch/record/2313928 |