Operational and beam dynamics aspects of the RF system in 2015
The operation of the LHC RF system in 2015 is presented. After a brief summary of the changes made during Long Shutdown 1 (LS1) and recommissioning in the beginning of 2015, operational RF parameters, new diagnos-tics, and failures related to low-power level RF and controls are detailed. Machine dev...