Cargando…
Operational and beam dynamics aspects of the RF system in 2015
The operation of the LHC RF system in 2015 is presented. After a brief summary of the changes made during Long Shutdown 1 (LS1) and recommissioning in the beginning of 2015, operational RF parameters, new diagnos-tics, and failures related to low-power level RF and controls are detailed. Machine dev...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2294527 |
_version_ | 1780956656369139712 |
---|---|
author | Timko, H Baudrenghien, P Esteban Müller, J Shaposhnikova, E |
author_facet | Timko, H Baudrenghien, P Esteban Müller, J Shaposhnikova, E |
author_sort | Timko, H |
collection | CERN |
description | The operation of the LHC RF system in 2015 is presented. After a brief summary
of the changes made during Long Shutdown 1 (LS1) and recommissioning in the
beginning of 2015, operational RF parameters, new diagnos-tics, and failures
related to low-power level RF and controls are detailed. Machine development
studies, as well as simulation and measurement studies related to longitudinal
beam stability and controlled longitudinal emittance blow-up have greatly
advanced our beam dynamics knowledge about the machine. Finally, an outlook of
plans for the 2016 is given. |
id | oai-inspirehep.net-1637715 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2016 |
publisher | CERN |
record_format | invenio |
spelling | oai-inspirehep.net-16377152019-09-30T06:29:59Zhttp://cds.cern.ch/record/2294527engTimko, HBaudrenghien, PEsteban Müller, JShaposhnikova, EOperational and beam dynamics aspects of the RF system in 2015Accelerators and Storage RingsThe operation of the LHC RF system in 2015 is presented. After a brief summary of the changes made during Long Shutdown 1 (LS1) and recommissioning in the beginning of 2015, operational RF parameters, new diagnos-tics, and failures related to low-power level RF and controls are detailed. Machine development studies, as well as simulation and measurement studies related to longitudinal beam stability and controlled longitudinal emittance blow-up have greatly advanced our beam dynamics knowledge about the machine. Finally, an outlook of plans for the 2016 is given.CERNoai:inspirehep.net:16377152016 |
spellingShingle | Accelerators and Storage Rings Timko, H Baudrenghien, P Esteban Müller, J Shaposhnikova, E Operational and beam dynamics aspects of the RF system in 2015 |
title | Operational and beam dynamics aspects of the RF system in 2015 |
title_full | Operational and beam dynamics aspects of the RF system in 2015 |
title_fullStr | Operational and beam dynamics aspects of the RF system in 2015 |
title_full_unstemmed | Operational and beam dynamics aspects of the RF system in 2015 |
title_short | Operational and beam dynamics aspects of the RF system in 2015 |
title_sort | operational and beam dynamics aspects of the rf system in 2015 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/2294527 |
work_keys_str_mv | AT timkoh operationalandbeamdynamicsaspectsoftherfsystemin2015 AT baudrenghienp operationalandbeamdynamicsaspectsoftherfsystemin2015 AT estebanmullerj operationalandbeamdynamicsaspectsoftherfsystemin2015 AT shaposhnikovae operationalandbeamdynamicsaspectsoftherfsystemin2015 |