Status and commissioning plans for LHC Run 2. The RF system.

The paper presents the work done on the LHC RF system during Long Shutdown 1 (LS1). On the High Level side we have replaced a cryomodule (four cavities, beam 2), which could not operate reliably at the design voltage (2 MV per cavity). The upgrade of klystron collectors has been completed and new cr...

Descripción completa

Detalles Bibliográficos
Autores principales: Baudrenghien, P, Arnaudon, L, Bohl, T, Brunner, O, Butterworth, A, Maesen, P, Muller, J E, Ravida, G, Shaposhnikova, E, Timko, H
Lenguaje:eng
Publicado: CERN 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/2295096
_version_ 1780956724984807424
author Baudrenghien, P
Arnaudon, L
Bohl, T
Brunner, O
Butterworth, A
Maesen, P
Muller, J E
Ravida, G
Shaposhnikova, E
Timko, H
author_facet Baudrenghien, P
Arnaudon, L
Bohl, T
Brunner, O
Butterworth, A
Maesen, P
Muller, J E
Ravida, G
Shaposhnikova, E
Timko, H
author_sort Baudrenghien, P
collection CERN
description The paper presents the work done on the LHC RF system during Long Shutdown 1 (LS1). On the High Level side we have replaced a cryomodule (four cavities, beam 2), which could not operate reliably at the design voltage (2 MV per cavity). The upgrade of klystron collectors has been completed and new crowbar systems have been installed (solid state thyristors replacing the old thyratrons). On the Controls side, all RIO3 CPUs are beeing replaced and the new ones are now using Linux. The new FESA classes are being designed with FESA3. The consequences of the increased beam current (0.55 A DC compared to 0.35 A in 2012), the increased energy (physics planned at 6.5 TeV/c per beam), and the exotic bunch spacing (5-20 ns for the scrubbing beams) will be analyzed from an RF hardware point of view. A tracking code is being developed to understand the effect of coloured phase noise on the longitudinal bunch profile. The expected benefits are the optimization of the blow-up and the possible shaping of bunch profile (flatter bunches) to avoid beam induced heating and improve beam stability. Upgraded longitudinal bunch-by-bunch measurements are being implemented.
id oai-inspirehep.net-1639516
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
publisher CERN
record_format invenio
spelling oai-inspirehep.net-16395162019-09-30T06:29:59Zhttp://cds.cern.ch/record/2295096engBaudrenghien, PArnaudon, LBohl, TBrunner, OButterworth, AMaesen, PMuller, J ERavida, GShaposhnikova, ETimko, HStatus and commissioning plans for LHC Run 2. The RF system.Accelerators and Storage RingsThe paper presents the work done on the LHC RF system during Long Shutdown 1 (LS1). On the High Level side we have replaced a cryomodule (four cavities, beam 2), which could not operate reliably at the design voltage (2 MV per cavity). The upgrade of klystron collectors has been completed and new crowbar systems have been installed (solid state thyristors replacing the old thyratrons). On the Controls side, all RIO3 CPUs are beeing replaced and the new ones are now using Linux. The new FESA classes are being designed with FESA3. The consequences of the increased beam current (0.55 A DC compared to 0.35 A in 2012), the increased energy (physics planned at 6.5 TeV/c per beam), and the exotic bunch spacing (5-20 ns for the scrubbing beams) will be analyzed from an RF hardware point of view. A tracking code is being developed to understand the effect of coloured phase noise on the longitudinal bunch profile. The expected benefits are the optimization of the blow-up and the possible shaping of bunch profile (flatter bunches) to avoid beam induced heating and improve beam stability. Upgraded longitudinal bunch-by-bunch measurements are being implemented.CERNoai:inspirehep.net:16395162014
spellingShingle Accelerators and Storage Rings
Baudrenghien, P
Arnaudon, L
Bohl, T
Brunner, O
Butterworth, A
Maesen, P
Muller, J E
Ravida, G
Shaposhnikova, E
Timko, H
Status and commissioning plans for LHC Run 2. The RF system.
title Status and commissioning plans for LHC Run 2. The RF system.
title_full Status and commissioning plans for LHC Run 2. The RF system.
title_fullStr Status and commissioning plans for LHC Run 2. The RF system.
title_full_unstemmed Status and commissioning plans for LHC Run 2. The RF system.
title_short Status and commissioning plans for LHC Run 2. The RF system.
title_sort status and commissioning plans for lhc run 2. the rf system.
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2295096
work_keys_str_mv AT baudrenghienp statusandcommissioningplansforlhcrun2therfsystem
AT arnaudonl statusandcommissioningplansforlhcrun2therfsystem
AT bohlt statusandcommissioningplansforlhcrun2therfsystem
AT brunnero statusandcommissioningplansforlhcrun2therfsystem
AT butterwortha statusandcommissioningplansforlhcrun2therfsystem
AT maesenp statusandcommissioningplansforlhcrun2therfsystem
AT mullerje statusandcommissioningplansforlhcrun2therfsystem
AT ravidag statusandcommissioningplansforlhcrun2therfsystem
AT shaposhnikovae statusandcommissioningplansforlhcrun2therfsystem
AT timkoh statusandcommissioningplansforlhcrun2therfsystem