Status and commissioning plans for LHC Run 2. The RF system.
The paper presents the work done on the LHC RF system during Long Shutdown 1 (LS1). On the High Level side we have replaced a cryomodule (four cavities, beam 2), which could not operate reliably at the design voltage (2 MV per cavity). The upgrade of klystron collectors has been completed and new cr...
Autores principales: | Baudrenghien, P, Arnaudon, L, Bohl, T, Brunner, O, Butterworth, A, Maesen, P, Muller, J E, Ravida, G, Shaposhnikova, E, Timko, H |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2295096 |
Ejemplares similares
-
Commissioning of the 400 MHz LHC RF System
por: Ciapala, Edmond, et al.
Publicado: (2008) -
First Beam Commissioning of the 400 MHz LHC RF System
por: Butterworth, A C, et al.
Publicado: (2009) -
LHC rf system performance in 2017
por: Timko, H, et al.
Publicado: (2019) -
RF System Availability and Performance during Run 2
por: Turaj, K, et al.
Publicado: (2019) -
Operation experience with the LHC RF system
por: Arnaudon, L, et al.
Publicado: (2010)