Cargando…

LHC vacuum system upgrade during long shutdown 1 and vacuum expectation for the 2015 operation restart

At the beginning of 2013 the LHC accelerator stopped for the Long Shutdown (LS1) by the need to consolidate the magnets interconnects. During this period of time, despite the very good performances of the beam vacuum system during the 2010-2012 physic run, different activities were held in parallel...

Descripción completa

Detalles Bibliográficos
Autores principales: Bregliozzi, G, Baglin, V, Lanza, G
Lenguaje:eng
Publicado: CERN 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/2295102