LHC vacuum system upgrade during long shutdown 1 and vacuum expectation for the 2015 operation restart

At the beginning of 2013 the LHC accelerator stopped for the Long Shutdown (LS1) by the need to consolidate the magnets interconnects. During this period of time, despite the very good performances of the beam vacuum system during the 2010-2012 physic run, different activities were held in parallel...

Descripción completa

Detalles Bibliográficos
Autores principales: Bregliozzi, G, Baglin, V, Lanza, G
Lenguaje:eng
Publicado: CERN 2014
Materias:
Acceso en línea:http://cds.cern.ch/record/2295102
_version_ 1780956726684549120
author Bregliozzi, G
Baglin, V
Lanza, G
author_facet Bregliozzi, G
Baglin, V
Lanza, G
author_sort Bregliozzi, G
collection CERN
description At the beginning of 2013 the LHC accelerator stopped for the Long Shutdown (LS1) by the need to consolidate the magnets interconnects. During this period of time, despite the very good performances of the beam vacuum system during the 2010-2012 physic run, different activities were held in parallel by the VSC group so as to consolidate, improve and upgrades some dedicated area of the LHC accelerator. As example a campaign aiming the consolidation of some RF bridges was conducted, NEG coated inserts were installed as a permanent electron cloud multipacting suppressor in critical locations and boosting of pumping speed by the introduction of compact NEG cartridges were performed in special devices. In addition consolidation of different beam equipment such as collimators, BGI, BSRT, BQS, installation of news TCDQ and MKB to name some, were carried out. In this paper a review of the main consolidations carried out during the LS1 in the beam vacuum system of the LHC are presented and discussed. Their impacts for the future operation are presented and finally a restart expected scenario for the LHC beam vacuum system is described.
id oai-inspirehep.net-1639523
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2014
publisher CERN
record_format invenio
spelling oai-inspirehep.net-16395232019-09-30T06:29:59Zhttp://cds.cern.ch/record/2295102engBregliozzi, GBaglin, VLanza, GLHC vacuum system upgrade during long shutdown 1 and vacuum expectation for the 2015 operation restartAccelerators and Storage RingsAt the beginning of 2013 the LHC accelerator stopped for the Long Shutdown (LS1) by the need to consolidate the magnets interconnects. During this period of time, despite the very good performances of the beam vacuum system during the 2010-2012 physic run, different activities were held in parallel by the VSC group so as to consolidate, improve and upgrades some dedicated area of the LHC accelerator. As example a campaign aiming the consolidation of some RF bridges was conducted, NEG coated inserts were installed as a permanent electron cloud multipacting suppressor in critical locations and boosting of pumping speed by the introduction of compact NEG cartridges were performed in special devices. In addition consolidation of different beam equipment such as collimators, BGI, BSRT, BQS, installation of news TCDQ and MKB to name some, were carried out. In this paper a review of the main consolidations carried out during the LS1 in the beam vacuum system of the LHC are presented and discussed. Their impacts for the future operation are presented and finally a restart expected scenario for the LHC beam vacuum system is described.CERNoai:inspirehep.net:16395232014
spellingShingle Accelerators and Storage Rings
Bregliozzi, G
Baglin, V
Lanza, G
LHC vacuum system upgrade during long shutdown 1 and vacuum expectation for the 2015 operation restart
title LHC vacuum system upgrade during long shutdown 1 and vacuum expectation for the 2015 operation restart
title_full LHC vacuum system upgrade during long shutdown 1 and vacuum expectation for the 2015 operation restart
title_fullStr LHC vacuum system upgrade during long shutdown 1 and vacuum expectation for the 2015 operation restart
title_full_unstemmed LHC vacuum system upgrade during long shutdown 1 and vacuum expectation for the 2015 operation restart
title_short LHC vacuum system upgrade during long shutdown 1 and vacuum expectation for the 2015 operation restart
title_sort lhc vacuum system upgrade during long shutdown 1 and vacuum expectation for the 2015 operation restart
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2295102
work_keys_str_mv AT bregliozzig lhcvacuumsystemupgradeduringlongshutdown1andvacuumexpectationforthe2015operationrestart
AT baglinv lhcvacuumsystemupgradeduringlongshutdown1andvacuumexpectationforthe2015operationrestart
AT lanzag lhcvacuumsystemupgradeduringlongshutdown1andvacuumexpectationforthe2015operationrestart