Cargando…
LHC vacuum system upgrade during long shutdown 1 and vacuum expectation for the 2015 operation restart
At the beginning of 2013 the LHC accelerator stopped for the Long Shutdown (LS1) by the need to consolidate the magnets interconnects. During this period of time, despite the very good performances of the beam vacuum system during the 2010-2012 physic run, different activities were held in parallel...
Autores principales: | Bregliozzi, G, Baglin, V, Lanza, G |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2014
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2295102 |
Ejemplares similares
-
CERN Vacuum-System Activities during the Long Shutdown 1: The LHC Beam Vacuum
por: Baglin, V, et al.
Publicado: (2014) -
Summary of Beam Vacuum Activities Held during the LHC 2008-2009 Shutdown
por: Bregliozzi, Giuseppe, et al.
Publicado: (2010) -
LHC Beam Vacuum During 2011 Machine Operation
por: Lanza, G, et al.
Publicado: (2012) -
Synchrotron Radiation in the LHC Vacuum System
por: Baglin, V, et al.
Publicado: (2011) -
LHC Vacuum System: 2012 Review and 2014 Outlook
por: Lanza, G, et al.
Publicado: (2012)