Cargando…
The Design, Construction and Operation of the Beam Instrumentation for the High Intensity and Energy Upgrade of ISOLDE at CERN
The High Intensity and Energy (HIE) upgrade to the on-line isotope separation facility (ISOLDE) facility at CERN is currently in the process of being commissioned. The very tight space available between the superconducting acceleration cavities used and a challenging specification led to the design...
Autores principales: | , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IBIC2016-MOPG27 http://cds.cern.ch/record/2313360 |