Cargando…

LHC RF: 2012 Performance and preparations for post LS1 operation

This paper presents the lessons learned through the RF system performance in 2012, the RF improvements in 2012, the RF plans for LS1, and the possible limitations on RF performance past LS1. An emphasis is placed on expected operation limits for operation with 25 ns bunch spacing, at 6.5 TeV, and/or...

Descripción completa

Detalles Bibliográficos
Autores principales: Mastoridis, T, Baudrenghien, P, Brunner, O, Shaposhnikova, E
Lenguaje:eng
Publicado: CERN 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/2302725