Cargando…

LHC RF: 2012 Performance and preparations for post LS1 operation

This paper presents the lessons learned through the RF system performance in 2012, the RF improvements in 2012, the RF plans for LS1, and the possible limitations on RF performance past LS1. An emphasis is placed on expected operation limits for operation with 25 ns bunch spacing, at 6.5 TeV, and/or...

Descripción completa

Detalles Bibliográficos
Autores principales: Mastoridis, T, Baudrenghien, P, Brunner, O, Shaposhnikova, E
Lenguaje:eng
Publicado: CERN 2012
Materias:
Acceso en línea:http://cds.cern.ch/record/2302725
_version_ 1780957302954655744
author Mastoridis, T
Baudrenghien, P
Brunner, O
Shaposhnikova, E
author_facet Mastoridis, T
Baudrenghien, P
Brunner, O
Shaposhnikova, E
author_sort Mastoridis, T
collection CERN
description This paper presents the lessons learned through the RF system performance in 2012, the RF improvements in 2012, the RF plans for LS1, and the possible limitations on RF performance past LS1. An emphasis is placed on expected operation limits for operation with 25 ns bunch spacing, at 6.5 TeV, and/or with higher beam currents. Studies performed to improve understanding (single bunch and multi bunch intensity limits, beam spectrum and relation to heating) and to evaluate mitigation techniques for these limits are described. Development plans on new equipment are discussed. Of particular importance are the cavity set- point modulation technique, which significantly reduces the klystron forward power requirements, the longitudinal damper, batch-by-batch blow-up at injection, and the RF frequency cogging, essential for p-Pb operation.
id oai-inspirehep.net-1650700
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2012
publisher CERN
record_format invenio
spelling oai-inspirehep.net-16507002019-09-30T06:29:59Zhttp://cds.cern.ch/record/2302725engMastoridis, TBaudrenghien, PBrunner, OShaposhnikova, ELHC RF: 2012 Performance and preparations for post LS1 operationAccelerators and Storage RingsThis paper presents the lessons learned through the RF system performance in 2012, the RF improvements in 2012, the RF plans for LS1, and the possible limitations on RF performance past LS1. An emphasis is placed on expected operation limits for operation with 25 ns bunch spacing, at 6.5 TeV, and/or with higher beam currents. Studies performed to improve understanding (single bunch and multi bunch intensity limits, beam spectrum and relation to heating) and to evaluate mitigation techniques for these limits are described. Development plans on new equipment are discussed. Of particular importance are the cavity set- point modulation technique, which significantly reduces the klystron forward power requirements, the longitudinal damper, batch-by-batch blow-up at injection, and the RF frequency cogging, essential for p-Pb operation.CERNoai:inspirehep.net:16507002012
spellingShingle Accelerators and Storage Rings
Mastoridis, T
Baudrenghien, P
Brunner, O
Shaposhnikova, E
LHC RF: 2012 Performance and preparations for post LS1 operation
title LHC RF: 2012 Performance and preparations for post LS1 operation
title_full LHC RF: 2012 Performance and preparations for post LS1 operation
title_fullStr LHC RF: 2012 Performance and preparations for post LS1 operation
title_full_unstemmed LHC RF: 2012 Performance and preparations for post LS1 operation
title_short LHC RF: 2012 Performance and preparations for post LS1 operation
title_sort lhc rf: 2012 performance and preparations for post ls1 operation
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/2302725
work_keys_str_mv AT mastoridist lhcrf2012performanceandpreparationsforpostls1operation
AT baudrenghienp lhcrf2012performanceandpreparationsforpostls1operation
AT brunnero lhcrf2012performanceandpreparationsforpostls1operation
AT shaposhnikovae lhcrf2012performanceandpreparationsforpostls1operation