Cargando…
LHC RF: 2012 Performance and preparations for post LS1 operation
This paper presents the lessons learned through the RF system performance in 2012, the RF improvements in 2012, the RF plans for LS1, and the possible limitations on RF performance past LS1. An emphasis is placed on expected operation limits for operation with 25 ns bunch spacing, at 6.5 TeV, and/or...
Autores principales: | Mastoridis, T, Baudrenghien, P, Brunner, O, Shaposhnikova, E |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2012
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2302725 |
Ejemplares similares
-
Studies on Controlled RF Noise for the LHC
por: Timko, Helga, et al.
Publicado: (2015) -
LHC rf system performance in 2017
por: Timko, H, et al.
Publicado: (2019) -
The LHC RF–2011 and beyond
por: Baudrenghien, P, et al.
Publicado: (2012) -
Operation experience with the LHC RF system
por: Arnaudon, L, et al.
Publicado: (2010) -
Proposal for an RF roadmap towards Ultimate Intensity in the LHC
por: Baudrenghien, P, et al.
Publicado: (2012)