Cargando…
CMS DAQ current and future hardware upgrades up to post Long Shutdown 3 (LS3) times
Following the first LHC collisions seen and recorded by CMS in 2009, the DAQ hardware went through a major upgrade during LS1 (2013- 2014) and new detectors have been connected during 2015-2016 and 2016-2017 winter shutdowns. Now, LS2 (2019-2020) and LS3 (2024-mid 2026) are actively being prepared....
Autores principales: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
SISSA
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.22323/1.313.0123 http://cds.cern.ch/record/2312295 |