Cargando…

Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam

In the framework of the LHC Injector Upgrade (LIU) project, the Proton Synchrotron Booster (PSB) will be extensively modified during the Long Shutdown 2 (LS2, 2019-2020) at CERN [1]. This includes a new injector, Linac4, which will provide a 160 MeV H⁻ beam and a complete new injection section for t...

Descripción completa

Detalles Bibliográficos
Autores principales: Guidoboni, Greta, Allica, Juan, Bracco, Chiara, Burger, Stephane, Focker, Gerrit Jan, Mikulec, Bettina, Navarro Fernandez, Araceli, Roncarolo, Federico, Søby, Lars, Zamantzas, Christos
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IBIC2017-MOPWC07
http://cds.cern.ch/record/2663356