Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam
In the framework of the LHC Injector Upgrade (LIU) project, the Proton Synchrotron Booster (PSB) will be extensively modified during the Long Shutdown 2 (LS2, 2019-2020) at CERN [1]. This includes a new injector, Linac4, which will provide a 160 MeV H⁻ beam and a complete new injection section for t...
Autores principales: | , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IBIC2017-MOPWC07 http://cds.cern.ch/record/2663356 |
_version_ | 1780961710894481408 |
---|---|
author | Guidoboni, Greta Allica, Juan Bracco, Chiara Burger, Stephane Focker, Gerrit Jan Mikulec, Bettina Navarro Fernandez, Araceli Roncarolo, Federico Søby, Lars Zamantzas, Christos |
author_facet | Guidoboni, Greta Allica, Juan Bracco, Chiara Burger, Stephane Focker, Gerrit Jan Mikulec, Bettina Navarro Fernandez, Araceli Roncarolo, Federico Søby, Lars Zamantzas, Christos |
author_sort | Guidoboni, Greta |
collection | CERN |
description | In the framework of the LHC Injector Upgrade (LIU) project, the Proton Synchrotron Booster (PSB) will be extensively modified during the Long Shutdown 2 (LS2, 2019-2020) at CERN [1]. This includes a new injector, Linac4, which will provide a 160 MeV H⁻ beam and a complete new injection section for the PSB composed essentially of a chicane and a stripping foil system. The equivalent of half of this new injection chicane, so-called Half-Sector Test (HST), was tempo-rarily installed in the Linac4 transfer line to evaluate the performance of the novel beam instrumentation, such as, stripping foils, monitoring screens, beam cur-rent transformers, H⁰/H⁻ monitor and dump, beam loss monitors, and beam position monitors. The results of the instrumentation commissioning of the HST are presented in this paper. |
id | oai-inspirehep.net-1673476 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2018 |
record_format | invenio |
spelling | oai-inspirehep.net-16734762019-09-30T06:29:59Zdoi:10.18429/JACoW-IBIC2017-MOPWC07http://cds.cern.ch/record/2663356engGuidoboni, GretaAllica, JuanBracco, ChiaraBurger, StephaneFocker, Gerrit JanMikulec, BettinaNavarro Fernandez, AraceliRoncarolo, FedericoSøby, LarsZamantzas, ChristosCommissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ BeamAccelerators and Storage RingsIn the framework of the LHC Injector Upgrade (LIU) project, the Proton Synchrotron Booster (PSB) will be extensively modified during the Long Shutdown 2 (LS2, 2019-2020) at CERN [1]. This includes a new injector, Linac4, which will provide a 160 MeV H⁻ beam and a complete new injection section for the PSB composed essentially of a chicane and a stripping foil system. The equivalent of half of this new injection chicane, so-called Half-Sector Test (HST), was tempo-rarily installed in the Linac4 transfer line to evaluate the performance of the novel beam instrumentation, such as, stripping foils, monitoring screens, beam cur-rent transformers, H⁰/H⁻ monitor and dump, beam loss monitors, and beam position monitors. The results of the instrumentation commissioning of the HST are presented in this paper.oai:inspirehep.net:16734762018 |
spellingShingle | Accelerators and Storage Rings Guidoboni, Greta Allica, Juan Bracco, Chiara Burger, Stephane Focker, Gerrit Jan Mikulec, Bettina Navarro Fernandez, Araceli Roncarolo, Federico Søby, Lars Zamantzas, Christos Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam |
title | Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam |
title_full | Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam |
title_fullStr | Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam |
title_full_unstemmed | Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam |
title_short | Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam |
title_sort | commissioning of the beam instrumentation for the half sector test in linac4 with a 160 mev h⁻ beam |
topic | Accelerators and Storage Rings |
url | https://dx.doi.org/10.18429/JACoW-IBIC2017-MOPWC07 http://cds.cern.ch/record/2663356 |
work_keys_str_mv | AT guidobonigreta commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam AT allicajuan commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam AT braccochiara commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam AT burgerstephane commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam AT fockergerritjan commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam AT mikulecbettina commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam AT navarrofernandezaraceli commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam AT roncarolofederico commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam AT søbylars commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam AT zamantzaschristos commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam |