Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam

In the framework of the LHC Injector Upgrade (LIU) project, the Proton Synchrotron Booster (PSB) will be extensively modified during the Long Shutdown 2 (LS2, 2019-2020) at CERN [1]. This includes a new injector, Linac4, which will provide a 160 MeV H⁻ beam and a complete new injection section for t...

Descripción completa

Detalles Bibliográficos
Autores principales: Guidoboni, Greta, Allica, Juan, Bracco, Chiara, Burger, Stephane, Focker, Gerrit Jan, Mikulec, Bettina, Navarro Fernandez, Araceli, Roncarolo, Federico, Søby, Lars, Zamantzas, Christos
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IBIC2017-MOPWC07
http://cds.cern.ch/record/2663356
_version_ 1780961710894481408
author Guidoboni, Greta
Allica, Juan
Bracco, Chiara
Burger, Stephane
Focker, Gerrit Jan
Mikulec, Bettina
Navarro Fernandez, Araceli
Roncarolo, Federico
Søby, Lars
Zamantzas, Christos
author_facet Guidoboni, Greta
Allica, Juan
Bracco, Chiara
Burger, Stephane
Focker, Gerrit Jan
Mikulec, Bettina
Navarro Fernandez, Araceli
Roncarolo, Federico
Søby, Lars
Zamantzas, Christos
author_sort Guidoboni, Greta
collection CERN
description In the framework of the LHC Injector Upgrade (LIU) project, the Proton Synchrotron Booster (PSB) will be extensively modified during the Long Shutdown 2 (LS2, 2019-2020) at CERN [1]. This includes a new injector, Linac4, which will provide a 160 MeV H⁻ beam and a complete new injection section for the PSB composed essentially of a chicane and a stripping foil system. The equivalent of half of this new injection chicane, so-called Half-Sector Test (HST), was tempo-rarily installed in the Linac4 transfer line to evaluate the performance of the novel beam instrumentation, such as, stripping foils, monitoring screens, beam cur-rent transformers, H⁰/H⁻ monitor and dump, beam loss monitors, and beam position monitors. The results of the instrumentation commissioning of the HST are presented in this paper.
id oai-inspirehep.net-1673476
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2018
record_format invenio
spelling oai-inspirehep.net-16734762019-09-30T06:29:59Zdoi:10.18429/JACoW-IBIC2017-MOPWC07http://cds.cern.ch/record/2663356engGuidoboni, GretaAllica, JuanBracco, ChiaraBurger, StephaneFocker, Gerrit JanMikulec, BettinaNavarro Fernandez, AraceliRoncarolo, FedericoSøby, LarsZamantzas, ChristosCommissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ BeamAccelerators and Storage RingsIn the framework of the LHC Injector Upgrade (LIU) project, the Proton Synchrotron Booster (PSB) will be extensively modified during the Long Shutdown 2 (LS2, 2019-2020) at CERN [1]. This includes a new injector, Linac4, which will provide a 160 MeV H⁻ beam and a complete new injection section for the PSB composed essentially of a chicane and a stripping foil system. The equivalent of half of this new injection chicane, so-called Half-Sector Test (HST), was tempo-rarily installed in the Linac4 transfer line to evaluate the performance of the novel beam instrumentation, such as, stripping foils, monitoring screens, beam cur-rent transformers, H⁰/H⁻ monitor and dump, beam loss monitors, and beam position monitors. The results of the instrumentation commissioning of the HST are presented in this paper.oai:inspirehep.net:16734762018
spellingShingle Accelerators and Storage Rings
Guidoboni, Greta
Allica, Juan
Bracco, Chiara
Burger, Stephane
Focker, Gerrit Jan
Mikulec, Bettina
Navarro Fernandez, Araceli
Roncarolo, Federico
Søby, Lars
Zamantzas, Christos
Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam
title Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam
title_full Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam
title_fullStr Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam
title_full_unstemmed Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam
title_short Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam
title_sort commissioning of the beam instrumentation for the half sector test in linac4 with a 160 mev h⁻ beam
topic Accelerators and Storage Rings
url https://dx.doi.org/10.18429/JACoW-IBIC2017-MOPWC07
http://cds.cern.ch/record/2663356
work_keys_str_mv AT guidobonigreta commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam
AT allicajuan commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam
AT braccochiara commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam
AT burgerstephane commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam
AT fockergerritjan commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam
AT mikulecbettina commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam
AT navarrofernandezaraceli commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam
AT roncarolofederico commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam
AT søbylars commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam
AT zamantzaschristos commissioningofthebeaminstrumentationforthehalfsectortestinlinac4witha160mevhbeam