Commissioning of the Beam Instrumentation for the Half Sector Test in Linac4 with a 160 MeV H⁻ Beam
In the framework of the LHC Injector Upgrade (LIU) project, the Proton Synchrotron Booster (PSB) will be extensively modified during the Long Shutdown 2 (LS2, 2019-2020) at CERN [1]. This includes a new injector, Linac4, which will provide a 160 MeV H⁻ beam and a complete new injection section for t...
Autores principales: | Guidoboni, Greta, Allica, Juan, Bracco, Chiara, Burger, Stephane, Focker, Gerrit Jan, Mikulec, Bettina, Navarro Fernandez, Araceli, Roncarolo, Federico, Søby, Lars, Zamantzas, Christos |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IBIC2017-MOPWC07 http://cds.cern.ch/record/2663356 |
Ejemplares similares
-
Commissioning and Results of the Half-Sector Test Installation with 160 MeV H⁻ beam from Linac4
por: Mikulec, Bettina, et al.
Publicado: (2017) -
Beam Instrumentation for the CERN LINAC4 and PSB Half Sector Test
por: Roncarolo, Federico, et al.
Publicado: (2017) -
Beam Diagnostics Measurements at 3MeV of the LINAC4 $H^{−}$ Beam at CERN
por: Zocca, Francesca, et al.
Publicado: (2014) -
Beam diagnostics measurements at 3 MeV of the LINAC4 H- beam at CERN
por: Zocca, F, et al.
Publicado: (2014) -
Beam Commissioning of the New 160 MeV H⁻ Injection System of the CERN PS Booster
por: Renner, Elisabeth, et al.
Publicado: (2021)