Cargando…
First operational experience with the HIE-Isolde helium cryogenic system including several RF cryo-modules
The High Intensity and Energy ISOLDE (HIE-ISOLDE) upgrade project at CERN includes the deployment of new superconducting accelerating structures operated at 4.5 K (ultimately of six cryo-modules) installed in series, and the refurbishing of the helium cryo-plant previously used to cool the ALEPH mag...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1757-899X/278/1/012121 http://cds.cern.ch/record/2621063 |