Cargando…
First operational experience with the HIE-Isolde helium cryogenic system including several RF cryo-modules
The High Intensity and Energy ISOLDE (HIE-ISOLDE) upgrade project at CERN includes the deployment of new superconducting accelerating structures operated at 4.5 K (ultimately of six cryo-modules) installed in series, and the refurbishing of the helium cryo-plant previously used to cool the ALEPH mag...
Autores principales: | Guillotin, N, Dupont, T, Gayet, Ph, Pirotte, O |
---|---|
Lenguaje: | eng |
Publicado: |
2017
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1088/1757-899X/278/1/012121 http://cds.cern.ch/record/2621063 |
Ejemplares similares
-
Commissioning of the helium cryogenic system for the HIE- ISOLDE accelerator upgrade at CERN
por: Delruelle, N, et al.
Publicado: (2015) -
First HIE-ISOLDE cryo-module assembly at CERN
por: Therasse, Mathieu, et al.
Publicado: (2015) -
First Operational Experience of HIE-Isolde
por: Rodriguez, Jose, et al.
Publicado: (2016) -
The Assembly Experience of the First Cryo-module for HIE-ISOLDE at CERN
por: Leclercq, Yann, et al.
Publicado: (2015) -
Proposal for the award of a contract for the supply, installation and commissioning of a helium cryogenic distribution system for the HIE-ISOLDE infrastructure
Publicado: (2013)