Cargando…
Initial Testing of Techniques for Large Scale Rf Conditioning for the Compact Linear Collider
Nominal operating conditions for the Compact Linear Collider (CLIC) 380 GeV requires 72 MV/m loaded accelerating gradients for a 180 ns flat-top pulse. Achieving this requires extensive RF conditioning which past tests have demonstrated can take several months per structure, when conditioned at the...
Autores principales: | , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-THPMK103 http://cds.cern.ch/record/2648552 |