Cargando…
Initial Testing of Techniques for Large Scale Rf Conditioning for the Compact Linear Collider
Nominal operating conditions for the Compact Linear Collider (CLIC) 380 GeV requires 72 MV/m loaded accelerating gradients for a 180 ns flat-top pulse. Achieving this requires extensive RF conditioning which past tests have demonstrated can take several months per structure, when conditioned at the...
Autores principales: | Lucas, Thomas, Boland, Mark, Catalán Lasheras, Nuria, Giansiracusa, Paul, Grudiev, Alexej, Lefèvre, Thibaut, McMonagle, Gerard, Paszkiewicz, Jan, Rassool, Roger, Serpico, Claudio, Syratchev, Igor, Vnuchenko, Anna, Volpi, Matteo, Woolley, Benjamin, Wuensch, Walter, Zennaro, Riccardo, del Pozo Romano, Veronica |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-THPMK103 http://cds.cern.ch/record/2648552 |
Ejemplares similares
-
High Power and High Repetition Rate X-band Power Source Using Multiple Klystrons
por: Volpi, Matteo, et al.
Publicado: (2018) -
High Power Conditioning of X-Band RF Components
por: Catalán Lasheras, Nuria, et al.
Publicado: (2018) -
High-Power Testing Results of X-Band RF-Window and 45 Degrees Spiral Load
por: Boronat, Marça, et al.
Publicado: (2022) -
High Gradient Performance of an S-Band Backward Traveling Wave Accelerating Structure for Medical Hadron Therapy Accelerators
por: Vnuchenko, Anna, et al.
Publicado: (2018) -
High-Power Test of Two Prototype X-Band Accelerating Structures Based on SwissFEL Fabrication Technology
por: Millar, William L, et al.
Publicado: (2023)