Cargando…
High Power Conditioning of X-Band RF Components
As part of the effort to qualify CLIC accelerating struc-tures prototypes, new X-band test facilities have been built and commissioned at CERN in the last years. In this context, a number of RF components have been designed and manufactured aiming at stable operation above 50 MW peak power and sever...
Autores principales: | , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPMF074 http://cds.cern.ch/record/2646747 |