Cargando…
High Power Conditioning of X-Band RF Components
As part of the effort to qualify CLIC accelerating struc-tures prototypes, new X-band test facilities have been built and commissioned at CERN in the last years. In this context, a number of RF components have been designed and manufactured aiming at stable operation above 50 MW peak power and sever...
Autores principales: | , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-WEPMF074 http://cds.cern.ch/record/2646747 |
Sumario: | As part of the effort to qualify CLIC accelerating struc-tures prototypes, new X-band test facilities have been built and commissioned at CERN in the last years. In this context, a number of RF components have been designed and manufactured aiming at stable operation above 50 MW peak power and several kW of average power. All of them have been tested now in the X-band facility at CERN either as part of the facility or in dedicated tests. Here, we describe shortly the main design and manufac-turing steps for each component, the testing and eventual conditioning as well as the final performance they achieved. |
---|