Cargando…

Multi-turn Study in FLUKA for the Design of CERN-PS Internal Beam Dumps

The CERN Proton-Synchrotron (PS) accelerator is currently equipped with two internal beam dumps in operation since the 1970's. An upgrade is required to be able to withstand the beams that will be produced after the end of the LIU (LHC Injector Upgrade) project. For the design of the new dumps,...

Descripción completa

Detalles Bibliográficos
Autores principales: Briz Monago, Jose, Calviani, Marco, Cerutti, Francesco, Esala, Jaakko, Gilardoni, Simone, Nuiry, Francois-Xavier, Romagnoli, Giulia, Sterbini, Guido, Vlachoudis, Vasilis
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2018-TUPAF025
http://cds.cern.ch/record/2664977