Cargando…

Multi-turn Study in FLUKA for the Design of CERN-PS Internal Beam Dumps

The CERN Proton-Synchrotron (PS) accelerator is currently equipped with two internal beam dumps in operation since the 1970's. An upgrade is required to be able to withstand the beams that will be produced after the end of the LIU (LHC Injector Upgrade) project. For the design of the new dumps,...

Descripción completa

Detalles Bibliográficos
Autores principales: Briz Monago, Jose, Calviani, Marco, Cerutti, Francesco, Esala, Jaakko, Gilardoni, Simone, Nuiry, Francois-Xavier, Romagnoli, Giulia, Sterbini, Guido, Vlachoudis, Vasilis
Lenguaje:eng
Publicado: 2018
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-IPAC2018-TUPAF025
http://cds.cern.ch/record/2664977
Descripción
Sumario:The CERN Proton-Synchrotron (PS) accelerator is currently equipped with two internal beam dumps in operation since the 1970's. An upgrade is required to be able to withstand the beams that will be produced after the end of the LIU (LHC Injector Upgrade) project. For the design of the new dumps, the interaction and transport of beam and all secondary particles generated has been simulated using FLUKA. The working principle of the internal beam dump in the PS ring is very peculiar with respect to the other dumps in the CERN accelerator complex. A moving dump intercepts the circulating beam during few milliseconds like a fast scraper. The moving dump shaving the beam, the multi-turn transport of beam particles in the PS accelerator and a time-dependent energy deposition in the dump were modeled. The methodology and the results obtained in our studies for the dump core and downstream equipment will be reported in this contribution.