Cargando…
Beam Optics Studies for BDF and for Tests of a Prototype Target
Within the frame of the Physics Beyond Collider project a new fixed target facility at the SPS North Area, the so-called Beam Dump Facility (BDF), is under study. BDF requires a high intensity slowly extracted 400 GeV proton beam with 4·10¹³ protons per 1 s spill to achieve 4·10¹⁹ protons on target...
Autores principales: | , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-TUPAF033 http://cds.cern.ch/record/2663364 |