Cargando…
Beam Optics Studies for BDF and for Tests of a Prototype Target
Within the frame of the Physics Beyond Collider project a new fixed target facility at the SPS North Area, the so-called Beam Dump Facility (BDF), is under study. BDF requires a high intensity slowly extracted 400 GeV proton beam with 4·10¹³ protons per 1 s spill to achieve 4·10¹⁹ protons on target...
Autores principales: | Heßler, Christoph, Calviani, Marco, Dutheil, Yann, Fraser, Matthew, Goddard, Brennan, Kain, Verena, Lopez Sola, Edmundo, Velotti, Francesco |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2018-TUPAF033 http://cds.cern.ch/record/2663364 |
Ejemplares similares
-
Beam Transfer Line Design to the SPS Beam Dump Facility
por: Dutheil, Yann, et al.
Publicado: (2018) -
Update on beam transfer line design for the SPS Beam Dump Facility
por: Dutheil, Yann, et al.
Publicado: (2019) -
CERN BDF Prototype Target Operation, Removal and Autopsy Steps
por: Franqueira Ximenes, Rui, et al.
Publicado: (2021) -
SPS Operation and Future Proton Sharing scenarios for the SHiP experiment at the BDF facility
por: Bartosik, Hannes, et al.
Publicado: (2018) -
A Beam Dump Facility (BDF) at CERN – The Concept and a First Radiological Assessment
por: Ahdida, Claudia Christina, et al.
Publicado: (2018)