Cargando…
Development of a control strategy for the 18 MW power converter of the CERN PS Booster accelerator
In the frame of the Large Hadron Collider Injectors Upgrade project, a new 18 MW power converter is required for the supply of the main magnets in the PS Booster accelerator. The power converter is composed of an Active Front End (AFE) and a DC/DC converter. A 3.5 MJ energy storage capacitor bank is...
Autores principales: | , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.1109/COMPEL.2018.8460164 http://cds.cern.ch/record/2646752 |