Cargando…
The Scintillator-ECAL Beam Test at DESY, 2007 - Update 3
A beam test of the SCECAL prototype module was performed in the period Feb 26 - Mar 28 2007 using 1-6 GeV positron beams at the DESY-II electron synchrotron. This note describes an update of the analysis presented in previous notes [1] [2] [3]. Changes with respect to previous notes include the corr...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2669473 |