Cargando…
The Scintillator-ECAL Beam Test at DESY, 2007 - First results
A beam test of the SCECAL test module was performed in the period Feb 26 - Mar 28 2007 using 1-6 GeV positron beams at the DESY-II electron synchrotron. This note briefly describes the first analysis and results of the beam test which will be shown at LCWS @ DESY in May 2007.
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2669478 |