Cargando…
The Scintillator-ECAL Beam Test at DESY, 2007 - First results
A beam test of the SCECAL test module was performed in the period Feb 26 - Mar 28 2007 using 1-6 GeV positron beams at the DESY-II electron synchrotron. This note briefly describes the first analysis and results of the beam test which will be shown at LCWS @ DESY in May 2007.
Autor principal: | CALICE Collaboration |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2669478 |
Ejemplares similares
-
The SCintillator-ECAL Beam Test at DESY, 2007 - Update 1
por: CALICE Collaboration
Publicado: (2007) -
The Scintillator-ECAL Beam Test at DESY, 2007 - Update 2
por: CALICE Collaboration
Publicado: (2008) -
The Scintillator-ECAL Beam Test at DESY, 2007 - Update 3
por: CALICE Collaboration
Publicado: (2008) -
First Stage Analysis of the Energy Response and Resolution of the Scintillator ECAL in the Beam Test at FNAL, 2008
por: CALICE Collaboration
Publicado: (2010) -
Energy Reconstruction of Hadrons in a Highly Granular Si-W ECAL and Plastic Scintillator HCAL Calorimeter System
por: CALICE Collaboration
Publicado: (2017)