Cargando…
Beam Characterization of the MYRRHA-RFQ
The Linear Accelerator for the MYRRHA project* is under construction. In a first step the linac up to 100 MeV will be realized. The LEBT section has been set into operation in Belgium and the RFQ is installed in summer 2018. A system to analyze the ion beam consisting of a slit-grid emittance scanne...
Autores principales: | , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2018
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-LINAC2018-THPO061 http://cds.cern.ch/record/2669845 |