Cargando…
Smoothing the LHC During LS1
The two-yearLong Shut-Down 1 (LS1), triggered by the repair of the splices in the interconnections of the Large Hadron Collider (LHC) cryo-magnets, gave the opportunity to the survey and alignment team to smooth the position of the 27km of the LHC in order to guaranty its best performance for the RU...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2680566 |