Cargando…
Smoothing the LHC During LS1
The two-yearLong Shut-Down 1 (LS1), triggered by the repair of the splices in the interconnections of the Large Hadron Collider (LHC) cryo-magnets, gave the opportunity to the survey and alignment team to smooth the position of the 27km of the LHC in order to guaranty its best performance for the RU...
Autores principales: | Missiaen, D, Fuchs, J -F |
---|---|
Lenguaje: | eng |
Publicado: |
2016
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/2680566 |
Ejemplares similares
-
Managing the Survey Activities during LS1
por: Missiaen, Dominique, et al.
Publicado: (2014) -
LHC Vacuum Upgrade during LS1
por: Jimenez, J M, et al.
Publicado: (2012) -
UFOs in the LHC after LS1
por: Baer, T, et al.
Publicado: (2012) -
The First Long Shutdown (LS1) for the LHC
por: Bordry, F, et al.
Publicado: (2013) -
Consolidation of the LHC superconducting magnets and circuits during LS1
por: Tock, J Ph
Publicado: (2012)