Cargando…
Results from the CERN LINAC4 Longitudinal Bunch Shape Monitor
The CERN Linac4 has been successfully commissioned to its nominal energy and will provide 160 MeV H⁻ ions for charge-exchange injection into the Proton Synchrotron Booster (PSB) from 2020. A complete set of beam diagnostic devices has been installed along the accelerating structures and the transfer...
Autores principales: | , , , |
---|---|
Lenguaje: | eng |
Publicado: |
JACoW
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IBIC2018-WEPA19 http://cds.cern.ch/record/2716028 |