Cargando…

Early Commissioning of the Luminosity Dither System for SuperKEKB

SuperKEKB is an electron-positron double ring collider at KEK which aims at a peak luminosity of 8 x 10³⁵ cm⁻²s⁻¹ by using what is known as the ’nano-beam’ scheme. A luminosity dither system is employed for collision orbit feedback in the horizontal plane. This paper reports a system layout of the d...

Descripción completa

Detalles Bibliográficos
Autores principales: Funakoshi, Yoshihiro, Bambade, Philip, Brown, David, Di Carlo, Salvatore, El Khechen, Dima, Fisher, Alan, Jehanno, Didier, Kawamoto, Takashi, Masuzawa, Mika, Nakamura, Shu, Oki, Toshiyuki, Pang, Chengguo, Sullivan, Michael, Tobiyama, Makoto, Uehara, Sadaharu, Ueki, Ryuichi, Wienands, Ulrich
Lenguaje:eng
Publicado: JACOW 2019
Materias:
Acceso en línea:https://dx.doi.org/10.18429/JACoW-eeFACT2018-WEXBA04
http://cds.cern.ch/record/2713265