Cargando…
LHC injection losses and trajectories during Run 1 and 2 and outlook to injection of HL-LHC beams
The LHC turn-around time is impacted by the control of injection losses and trajectories. While shot-to-shot trajectory variations dominated the injection efficiency during LHC Run 1, several improvements of hardware and operational settings allowed for a high rate of successful injections during Ru...
Autores principales: | , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2019-WEPMP030 http://cds.cern.ch/record/2693720 |