Beam based measurements of relative RF phase

The ferrite loaded RF cavities of the CERN Proton Synchrotron Booster will be replaced with Finemet™ loaded cavities during Long Shutdown 2 (2019-2020). To fully realise the potential of the new cavities, the relative RF phases must be aligned along the acceleration ramp, where the revolution freque...