Cargando…
Beam based measurements of relative RF phase
The ferrite loaded RF cavities of the CERN Proton Synchrotron Booster will be replaced with Finemet™ loaded cavities during Long Shutdown 2 (2019-2020). To fully realise the potential of the new cavities, the relative RF phases must be aligned along the acceleration ramp, where the revolution freque...
Autores principales: | Albright, Simon, Kuczynski, Michal |
---|---|
Lenguaje: | eng |
Publicado: |
2019
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.18429/JACoW-IPAC2019-THPRB066 http://cds.cern.ch/record/2693008 |
Ejemplares similares
-
Beam based measurements of relative RF phase
por: Kuczynski, Michal Dariusz
Publicado: (2018) -
Time varying RF phase noise for longitudinal emittance blow-up
por: Albright, Simon, et al.
Publicado: (2019) -
Beam Commissioning of the New Digital Low-Level RF System for CERN’s AD
por: Angoletta, Maria Elena, et al.
Publicado: (2022) -
RF Voltage Calibration Using Phase Space Tomography in the CERN SPS
por: Quartullo, Danilo, et al.
Publicado: (2022) -
High-Precision Beam-Based RF Phase Stabilization at Jefferson Lab
por: Lebedev, V A, et al.
Publicado: (1999)